Technip confirms consortium's award for Shtokman floater concept

Feb 26, 2009 01:00 AM

Technip, in a consortium with Aker Solutions and SBM Offshore, has been awarded by Shtokman Development an engineering contract for the floating production unit for the offshore portion of the first phase of the integrated development of the Shtokman gas-condensate field in Russia.
The contract is worth approximately EUR 25 mm.

The Shtokman field is located in the Barents Sea and is one of the world's largest gas condensate deposits with reserves of approximately 3,800 bn cm of gas and 37 mm tons of hydrocarbon condensate.
Technip's operating centre in Paris will participate in the execution of the contract, which is scheduled to be completed in the first half of 2010. It includes concept definition for the floating production unit, front end engineering design (FEED) for the hull, turret & mooring system and topsides.

The work will be performed by an experienced integrated team involving the three partners of the consortium, with Aker Solutions as leader. The consortium is committed to take any opportunity to increase the Russian content and transfer its technology as per the guidelines provided by Shtokman Development AG.
The Shtokman project involves highly challenging technology: the floating production unit will be able to withstand the extreme climate conditions of the Arctic Ocean, with a disconnectable ice-resistant hull to avoid the threat of large icebergs.

Shareholders in Shtokman Development are Gazprom (51 %), Total (25 %), and StatoilHydro (24 %).

Source / Technip
Alexander's Commentary

Change of face - change of phase

In the period of July 20 till August 3, 2015, Alexander will be out of the office and the site will not or only irreg

read more ...
« July 2020 »
July
MoTuWeThFrSaSu
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31

Register to announce Your Event

View All Events