ExxonMobil starts up NGL II project in Nigeria
ExxonMobil announced that its affiliate has commenced operations of a $ 1.3 bn project in Nigeria to produce and sell
natural gas liquids, providing a new source of energy and economic benefits while reducing environmental
impacts.
Operated by Mobil Producing Nigeria Unlimited, an ExxonMobil affiliate, the East Area Natural Gas Liquids II project
involves the recovery of 275 mm barrels of natural gas liquids from associated gas produced in East Area reservoirs
from Blocks OML 67, 68 and 70.
Major components of the project include an offshore natural gas liquids extraction complex, more than 125 miles (200
km) of new natural gas and natural gas liquids pipelines and expansion of the existing onshore Bonny River Terminal
for fractionation of the liquids into commercial products and offloading. The natural gas liquids project is part of
an integrated approach to significantly reduce flaring in conjunction with the existing East Area Additional Oil
Recovery project.
The projects will significantly reduce flaring and improve oil recovery through reservoir pressure maintenance. In
addition, the East Area NGL II project will produce at its peak about 50,000 barrels of natural gas liquids per day.
It is designed to ultimately recover 275 mm barrels of natural gas liquids and utilize 950 mm cf of gas daily.
"The East Area NGL II project was completed ahead of schedule with outstanding safety performance and demonstrates
ExxonMobil's ongoing commitment to helping meet the world’s growing need for energy. In addition, this project
represents the first time a major oil and gas joint venture in Nigeria has completed a financing package exclusively
through Nigerian financial institutions," said Mark Albers, Senior VP of ExxonMobil.
"Working together with the Nigerian National Petroleum Corporation, we were also able to integrate innovative
technical solutions into the project execution plan to significantly reduce flaring and maximize the value of the
resource for our shareholders and the country of Nigeria."
The East Area NGL II development continues Mobil Producing Nigeria’s tradition of strengthening and expanding
the capabilities of Nigerian companies, which provided in-country fabrication, logistics support and other services,
as well as training and development of employees and contractors. These companies were involved in construction of
the Bonny River Terminal expansion, installation of pipelines and fabrication of components for the offshore
complex.
A key part of NGL II development’s national content strategy included the use of funding from Nigerian banks.
Approximately $ 220 mm of the total project financing was completely arranged through Nigerian banks.
The natural gas liquids project follows the successful start-up of the East Area Additional Oil Recovery project in
June 2006. Together, the two developments provide for recovery and commercialization of associated gas streams in the
field and gas injection into existing reservoirs for recovery and production of additional oil volumes. These
projects significantly reduce routine flaring, which helps meet the environmental stewardship goals of ExxonMobil and
Nigeria.
The project is located approximately 17 miles (28 km) offshore Nigeria and on Bonny Island, Nigeria. Mobil Producing
Nigeria (51 % interest) is operator of the project with co-venture partner Nigerian National Petroleum Corporation
(49 %). The start-up of the NGL II project brings the total of ExxonMobil worldwide start-ups to five this year,
including Kizomba C Mondo (Angola), Volve (Norway), Starling (UK) and ACG Phase 3 (Azerbaijan).
